Pine
Telephone Company
Request for
Proposal
Install
materials
Posted
05/12/2011
Proposals
are due by COB
05/25/2011
This RFP is for 4 separate proposals. A separate proposal for each contract will be required. The Proposals are due by COB on May 25, 2011. Please submit by email all proposals to RFP@pine-net.com. Please use the English System of measurement in all correspondence. The contract which will be used is linked under ÒStandard Purchase ContractÓ on the www.pinetelephone.com home page. Please contact us before the RFP deadline for specific questions or to give a presentation on your product.
Contract 1 29 sets
Contract 2 30 sets
Contract 3 23 sets
Contract 4 10 sets
All of the materials listed below equal one set. As an example contract 1 will the 29
times the materials listed below.
There is no need to package the materials by set. As
an example for contract 1.
55Õ of #2 green ground wire(19 strands)
The material listed above is for 1 set and contract 1
requires 29 of these. What we would
expect to receive would be approximately 1600Õ on 2, 3 or 4 spools depending on
standard spool length.
Central
Equipment Frame
1- 7Õ tall bare aluminum frame (19Ó Telco style)
Grounding
2- large ground bar(1/4Óx4Óx24Ó, 5/8Ó-1Ó universal hole
pattern with ¾Ó horizontal spacing)
6Õ deep slotted channel(ÔUnistrut syleÕ channel that is
41mmx41mm with 25mmx11mm slots spaced 25mm apart)
2- 2Õ pieces of 3/8Ó steel all-thread
4- 3/8Ó twirl nuts(Cooper B-Line #TN228-ZN-38)
2- each of 2Ó long by 3/8Ó steel bolts, washers, and nuts
14- halo standoff hangers(halo standoff insulating bracket
that fits #2 wire (ALT #3890))
4- copper split bolt connectors that fits #2 wire for
grounding pig tails to halo(FCI USA #KS22RK)
Misc.
Hardware
40- ¼Óx1 ½Ó self tapping steel screws for
ground bars, standoff hangers, and deep slotted channel
25- ¼Ó steel washers
8- 3/8Óx1 ½Ó steel lag bolts for mounting frames
8- 3/8Ó steel fender washers for mounting frames
¼Óx1Ó steel bolts, nuts, and washers for binding
frames together
Crimp wire connectors(blue and yellow ring and fork
terminals)
1- 100 count bag 15Ó zip ties
6- 3Ó hose clamps
15Ó of deep slotted channel(ÔUnistrut syleÕ channel that is
41mmx41mm with 25mmx11mm slots spaced 25mm apart)
2- 2Õ pieces of ½Ó steel all-thread
2- ½Ó channel twirl nuts(Cooper
B-Line #TN228-ZN-38)
1- suspended runway support bracket set for 1 ½Ó runway
and ½Ó all-thread(Cooper B-Line #SB-2116-D)
2- 10Õ long segments of 12Óx1 ½Ó runway(Cooper B-Line
#10250-112)
1- runway coupler set(1 ½Ó runway splice clamp(Cooper
B-Line #SB-2107))
1- runway 90 degree connector set(1 ½Ó T junction(Cooper
B-Line #SB-2101-A))
3- runway wall mounts(1½Ócable
rack splice clamps and a 3½Óx2Ó mounting angle with ½Ó holes(Cooper
B-Line #SB-2106-B))
10- each of 3/8Óx2Ó bolts, washers, nuts, and lock washers(Bronze
coated)
10- each of ¼Óx2Ó bolts, washers, nuts, and lock
washers(Bronze coated)
Red, White, and Blue electrical tape ¾Ó width
Wire
and Lugs
Wire
55Õ of #2 green ground wire(19
strands)
25Õ of #4 green ground wire(100-400
strands)
30Õ of #4 red power wire(400
strands)
30Õ of #4 black power wire(400
strands)
30Õ of #6 red power wire(265
strands)
30Õ of #6 red power wire(265
strands)
40Õ of #6 green ground wire(65
strands)
6Õ of #12 dual conductor automotive wire red and black(65 strands)
12Õ of #16 dual conductor automotive wire red and black(26 strands)
50Õ of Cat 5E wire
Lugs
3- 2/0 black lugs with two 3/8Ó holes on 1Ó center spacing
3- #2 brown lugs with two 3/8Ó holes on 1Ó center spacing
20- #4 grey lugs with two ¼Ó holes on 5/8Ó center
spacing
2- #4 grey lugs with one ¼Ó hole
8- #6 blue lugs with two ¼Ó holes on 5/8Ó center
spacing
3- #6 blue lugs with one 5/8Ó hole
Other proposal requirements:
i. Terms for breach. Proposals must provide for administrative, contract or legal remedies for any breach or violation of the contract terms by the Vendor and appropriate remedial action.
ii. Termination clause. Proposals must include a termination clause indicating the manner by which termination will be effected and the basis for settlement. In addition, the clause will describe the conditions under which the contract may be terminated by default and the conditions under which the contract may be terminated for circumstances beyond the control of the Vendor.
iii. Access to documents. Proposals must include a provision permitting PTC, the Department of Commerce, the Comptroller General of the US, or any of their duly authorized representatives to have access to any books, documents, papers and records of the Vendors applicable to the Project for the purpose of making audits, examinations, excerpts and transcriptions.
iv. Contract Work Hours and Safety Standards Act (40 U.S.C. ¤¤ 327, 333). Proposals involving construction work or work that includes the employment of mechanics or laborers must include a provision for compliance with Sections 102 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327, 333), as supplemented by Department of Labor regulations (29 CFR Part5).
v. Clean Air Act (42 U.S.C. ¤ 7401 et seq.) and the Federal Water Pollution Act (33 U.S.C. ¤1251 et seq.). Proposals must contain a provision agreeing to abide by the Clean Air Act and the Federal Water Pollution Act.
vi. Byrd Anti-Lobbying Amendment (31 U.S.C. ¤ 1352). All Vendors must file the Byrd Anti-Lobbying Amendment certification, certifying that the Vendor will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of congress, office or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. ¤ 1352.
vii. Equal Employment Opportunity. Proposals must include a provision requiring compliance with Executive Order (ÒE.O.Ó) 11246, ÒEqual Employment Opportunity,Ó as amended by E.O. 11375, ÒAmending Executive Order 11246 Relating to Equal Employment Opportunity,Ó and as supplemented by regulations at 41 CFR Part 60, ÒOffice of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.Ó
viii. Copeland ÒAnti-KickbackÓ Act (18 U.S.C. ¤ 874 and 40 U.S.C. ¤ 276c). Proposals for contracts greater than $2,000 in construction or repair must include compliance with the Copeland ÒAnti-KickbackÓ Act.
ix. Davis-Bacon Act, as amended (40 U.S.C. ¤ 276a to 276a-7). Proposals for contracts greater than $2,000 must include a provision for compliance with the Davis-Bacon Act, including, specifically, payment of prevailing wage, weekly payroll distribution and timely and accurately providing records to PTC to demonstrate compliance.
x. Debarment and suspension (E.O.s 12549 and 12689): Proposals must include a statement indicating that the Vendor is not listed in the General Services AdministrationÕs List of Parties Excluded from Federal Procurement or Non-procurement Programs in accordance with Executive Orders 125449 and 12689.
xi. Signage: Proposals must include a statement that all construction sites (if any) will display signage that features the ARRA Primary emblem in a prominent location on site. The emblem must be displayed no less than six (6) inches in diameter.
Please check site often for updates. If planning to submit a proposal please email rfp@pine-net.com and you will be emailed when the site is updated. Please email all questions or concerns to email address above. PTC reserves the right to modify, change or cancel this RFP at any time. PTC has the right to refuse any or all proposals.